Sign In | Join Free | My portofva.com
China WUHAN FANKE HAIWO HIGH VOLTAGE TECHNOLOGY CO.,LTD. logo
WUHAN FANKE HAIWO HIGH VOLTAGE TECHNOLOGY CO.,LTD.
Professional High Voltage Test Equipment Manufacturer
Active Member

7 Years

Home > Power Transformer Testing Equipment >

Durable Power Transformer Testing Equipment For On Load Tap Changer Test

WUHAN FANKE HAIWO HIGH VOLTAGE TECHNOLOGY CO.,LTD.
Contact Now

Durable Power Transformer Testing Equipment For On Load Tap Changer Test

Brand Name : Fanke High-Voltage

Model Number : FKC-1A

Certification : ISO9001

Place of Origin : China

MOQ : One unit

Price : Negotiable

Payment Terms : T/T

Supply Ability : 10units/month

Delivery Time : 10 work days

Packaging Details : Export standard wooden case with fumigation free

Usage : On-load Tap-changer Characteristics Test

Ouput Current : 0.5A, 1A

Test range : 1-40Ω

Sample rate : 10~20 KHZ

Test Accuracy : 1-5Ω: ≤±10%. /5-40Ω :≤±5% Time error:≤±1%

LCD Monitor : 240´128T, T6963C controller

Contact Now

Power Transformer On-load Tap-changer Characteristics Tester , Transformer Tap-changer Tester

I. Products Description and Application

FKC-1A Tester is a comprehensive test equipment which is used to measure and analyze electrical properties index of on-load tap-changer of power transformer and special transformer in power system and has the function of analyzing, saving and printing test data. Controlled by computer, it can realize auto measuring of parameters such as transition time, transition waveform, transition resistance, and three-phase synchronism of on-load tap-changer through specially designed measuring circuit, so that user can not only measure via tap-changer lead, but also carry out measuring through direct wiring of three-phase sleeve of transformer and neutral point according to needs and site condition.

FKC-1A Tester is of vital importance in improving reliability of power system operation when promptly diagnosing latent fault of tap-changer in preventive test of power equipment and transformer overhaul, solving the problems of test method of on-load tap-changer of power transformer outdated and undedicated.

II. Features

1. Three-way independent test power source, max output current being 0.5A 1A

2. Equipment sample rate: 10~20 KHZ

3. Max saving time of single waveform: 6.4 seconds

4. Measuring range of transition resistance:1-40Ω for Y/0 type transformer

1-20Ω for Y type transformer.

5. Measuring accuracy:1-5Ω,≤±10%.

5-40Ω,Δ≤±5% Time error:Δ≤±1%

6. Monitor:240´128T, T6963C controller

7. Processing part:high speed 8-bit micro-processor, data memory: 512K

8. High speed A/D converter, max sample rate being 400 KHZ

9. Power source :220V ±10% Power £200W

10. Dimension: 410mm´320mm ´200mm.

11. Weight :20kg

III. Accessories

  • Test clip with 10m testing wire 4 pieces
  • Alligator clip with 1m testing wire 4 pieces
  • Power line 1 piece
  • Printing paper 2 rolls


Product Tags:

distribution transformer testing equipment

      

insulation resistance test set

      
China Durable Power Transformer Testing Equipment For On Load Tap Changer Test wholesale

Durable Power Transformer Testing Equipment For On Load Tap Changer Test Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: WUHAN FANKE HAIWO HIGH VOLTAGE TECHNOLOGY CO.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)